Dismantling of the parking Volta Nord, construction site 4

THE PROJECT

CLIENT              BASEL CITY
LOCATION
LOTHRINGERSTRASSE, BASEL
DURATION 2021 ‒ 2025

The dismantling of the Volta Nord parking garage represents a partial process for the reuse of concrete components. The reuse of reinforced concrete elements thus completes the circular economy process. 

The deconstruction project includes the dismantling of the Volta Nord parking garage, a construction built in the 1970s. The columns, beams and ceiling elements form the load-bearing structure of the building. They will be made available for the construction of a new building. Accordingly, a non-destructive and function-preserving removal will be carried out. First, the road surface must be removed without damaging the precast concrete elements. At the same time, the contaminated areas are separated from the precast elements and disposed of properly. After dismantling, the logistics of the precast concrete parts and the supports, some of which are 20 meters long, present a challenge. 

In addition to the preservation of the prefabricated concrete parts, the removal elements such as steel stairs, floor coverings and furnishings were removed in advance for further use. 

 

 

HIGHLIGHTS

  • Non-destructive and function-preserving removal of precast concrete parts
  • Removal of the in-situ concrete road surface without damaging the precast concrete parts
  • Logistics of the removed precast concrete parts, with expansions of up to 20 meters
  • Noise protection measures for milling and cutting work for the removal of the prefabricated concrete parts
  • Further use of removal parts such as steel stairs, floor coverings and furnishings

OUR SERVICES

  • SIA phases 31-53
  • Planning, tendering and construction management of
    • Development of the sustainable demolition process
    • Remediation of building contaminants
    • Gutting
  • Inventory of the prefabricated concrete parts as a basis for the new construction projects and the logistics at the interim storage facilities
  • Pollutant investigation of contaminated sites and building pollutants
  • Specialist site management for contaminated site remediation
  • Comparative analysis of reuse of prefabricated components and new construction
  • Dimensioning of excavation pit closures
  • Conventional dismantling of elements that cannot be reused

YOUR CONTACT PERSON(S)

+
Thomas Nägelin

Civil engineer HES, business mgmt HES
Branch manager / infrastructure